France – photovoltaic power plant – 2.5 MW

The project

It would take Tryba Energy almost 4 years of development to commission the solar power plant sheltering the parking area at the Ecomusée d’Alsace, located in the commune of Ungersheim in Alsace (France). A partnership with the Haut-Rhin departmental council built on trust ensured this project was a success. In addition to the production of renewable electrical power, this project provided an opportunity to increase the number of parking spaces, renovate certain zones and create a parking area for larger vehicles: camper vans and coaches.

Parking shelter – Ecomusée d’Alsace

  • Location: Ungersheim (Haut-Rhin) – France
  • Date commissioned: 2019
  • Development time: 4 years
  • Type: Photovoltaic parking shelter
  • Surface area: 2 ha
  • Installed capacity: 2.5 MWp

Our services

  • Complete development of the project (authorisation, electricity purchase agreement)
  • Financing
  • Construction with responsibility for redeveloping the existing parking area and creating an additional parking area
  • Operation and maintenance

Development of partnerships

Whether involved as a pure developer, or as a developer/investor, TRYBA ENERGY is a partner you can trust to bring your solar project to a successful conclusion.

International projects

As an IPP (Independent Power Producer), Tryba Energy develops and invests in photovoltaic power plants in emerging markets with significant renewable energy requirements.

Operation & Maintenance

TRYBA ENERGY guarantees the long-term operability and performance of your photovoltaic power plants thanks to a dedicated internal operational/maintenance department.